Achmelvich pods
2019. Retainer wall and pods. Main contractor: RW Mackenzie
2015. Extension of tidal pier. Main contractor: Anderson Group. The old pier can be seen in one of the images of the early stages of the works.
Galloway’s Pier, North Berwick Read More »
Various locations, Orkney 2008-2013 Formwork and steel fixing for 22 Enercon wind turbines across the islands. Main Contractor: Heddle Construction (Kirkwall)
Enercon wind turbine bases, Orkney Read More »